Green Build Environmental Ltd Complete Fragmental Asbestos Remediation Works

Green Build Environmental Ltd have successfully completed our Fragmental Asbestos Remediation project in Southampton for Crest Nicholson PLC.

Our package of works consisted of the production of onsite methodologies and the Asbestos Management plan, the segregation and removal of 1,700m3 of Fragmental Asbestos from within our controlled working zones, the relocation of contaminated stockpiles for screening and reuse under an MMP, submission of verification report for all known hotspots, and liaising with governing bodies to obtain regulatory sign off.

All works were completed within a programme duration of 20 days.

Green Build Environmental Ltd Complete Wembley Basement Excavation

Green Build Environmental Ltd have successfully removed our final load of our 19,000m3 order.  All 2,250 loads were removed over a 6 week period. At the peak of our programme, we were removing 2,600 tonnes per day.

 

Green Build Tara Tournament 2023 Attracts Over 3,000 People

Green Build Environmental Ltd were delighted to have hosted our second tournament, in partnership with Tara GFC, this weekend in Greenford, with a record 3,000 people in attendance over the course of the event.

This year saw the participation of 13 clubs from the UK & Ireland, with over 500 girls competing from Under 12’s up to Under 18’s. An incredible 96 people, of which 30 were players, travelled over from Ardara, Co. Donegal.

We cannot wait for the 2024 tournament coming around, and are incredible proud to be the only sponsor of what is the only girls tournament in London.

A huge thanks to the teams who competed this weekend: Tara’s, Parnells, Tir Chonaill Gaels, Claddagh Gaels, North London Shamrocks, St. Colmcilles, St Kiernans, Gael London, Adara, St. Joseph’s, Thomas McCurtains, St. Clarets and Glen Rovers.

#GAA #womenssport #competition

 

Green Build Environmental Ltd Complete Westferry Printworks Remediation

Green Build Environmental Ltd have successfully completed our five month remediation package in Canary Wharf for MACE.

The Westferry Printworks is being developed by Northern & Shell Group, where they will be building over 1,300 apartments, set across 12 blocks.

Our bespoke technology enabled us to reduce the Hazardous waste from 32% of the total 134,000m3 volume, down to 3%. We were able to treat all Hydrocarbon Impacted soils, as well as hand pick all Fragmental Asbestos, prior to removing the Creosote Contaminated Soils.

In addition, we processed in excess of 50,000m3 of Made Ground to provide a range of fill materials, which were reused on site under an MMP.

Once we excavated below 4 metres, we identified Alluvium Clay, which we then subsequently used at our Land Raising works in Kent for the new Amazon Distribution Centre. In total, we utilised 84,000m3 of this material for environmental betterment.

Green Build Environmental Ltd Progressing Well On Harrow Basement Excavation

Green Build Environmental Ltd have ticked over the 800 load mark for Muck Away removed from our project in North London. We worked with our client to successfully demolish the original row of terraced houses, before undertaking the Pile Attendance and subsequent basement excavation.

 

Green Build Environmental Ltd Complete Remediation Works In Leicester

Green Build Environmental Ltd have successfully completed our remediation package in Leicester. Working as Principal Contractor, we successfully hand picked all Fragmental Asbestos to reduce the volume of Hazardous Muck Away. We then treated and removed 2,800m3 of Hydrocarbon Impacted Soils, as well as an area of Giant Hogweed from around the party wall. We cleared all obstructions down to a two metre depth, re engineered the excavated spoil and constructed a 600mm Pile Mat across the entire site using our 6F5 IBA.

 

Green Build Environmental Ltd Secure Hayes Sub Station Package

Green Build Environmental Ltd have secured our second phase of work at Hayes Sub Station on behalf of National Grid. This package totals 4,700m3 of Non Hazardous Muck Away.

 

Green Build Environmental Ltd Secure Tottenham Hotspur FC New Stadium Works

Green Build Environmental Ltd have began removing the Non Hazardous Muck Away from the new Tottenham Hotspur FC stadium #COYS

 

Green Build Environmental Ltd Complete Goresbrook Park Muck Shift

Green Build Environmental Ltd have successfully completed the removal of over 200 loads of Muck Away over a 4 day period for our client McLaren Construction. The project is on behalf of Eddie Stobart at their Dagenham Depot.

 

Green Build Environmental Ltd Near Basement Dig Completion In NW10

Green Build Haulage have now successfully removed the first 22,000m3 of Inert Muck Away from this residential new build construction project in Stonebridge Park.