Case Studies

Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

ESSEX

c/o HALLMARK CARE HOMES, Former Hutton Fire Station, Rayleigh Close, Hutton, Brentwood, Essex

Working with our client we successfully removed 23,000m3 of Inert Clay Away from this retirement home project. At its peak we were removing 2,000 tonnes per day. Prior to this section of works, we removed over 200 loads of crushed material for the demolition contractor.

c/o READIE CONSTRUCTION, Beam Reach Business Park, Consul Avenue, Rainham, Essex

Working with our client we successfully removed 34,000m3 of Non Hazardous Muck Away, as well as 16,000m3 of excess Recycled Crushed Material. In addition, we also hauled a further 4,000 tonnes of material from this site to two other projects being developed by our client, having implemented the MMP.

c/o TILBURY DOUGLAS, M11 J7 Harlow Bank Improvements, Harlow, Essex

Working with our client we successfully removed 17,000m3 of Mixed Muck & Vegetation that couldn’t be separated on site due to the high clay content. 100% of the material was sent for secondary use, with nothing going to landfill.

c/o QUARTZ, Hawkins Road, Colchester, Essex, CO2

Working with our client we successfully removed 300 tonnes of Hydrocarbon Impacted Hazardous Muck Away and a further 160 tonnes of Fragmental Asbestos Mixed Muck Away, before we began the bulk dig of 9,700m3 of Non Hazardous Muck Away. At it’s peak, we were removing 700 tonnes per day.

c/o ACCESS SELF STORAGE, Waterglade Industrial Park, Glade Avenue, Thurrock, Essex, RM20

Working with our client we successfully removed 300 tonnes of Hazardous Fragmental Mixed Muck Away, as well as a further 3,000 tonnes of Incidental Non Hazardous Muck Away from this industrial development. The works were overseen by a full time watching brief, with background air monitoring in place throughout.

c/o HRD, Former Longmeads Community Centre, 12-14 Redwood Drive, Writtle, Essex, CM1

Working with our client we successfully undertook the licensed Asbestos Removal works from this residential development, before demolishing the outbuildings and removing 175 loads of Inert Muck Away over a 6 working day period. During the site reduction phase, we removed a further 270 loads of Inert Muck Away over a 10 day period, in line with our clients tight programme.

c/o PRISMA PROPERTY DEVELOPMENTS, Wych Elm House, Hamstel Road, Harlow, Essex, CM20

Working with our client we successfully isolated and removed an area of Hydrocarbon Impacted Hazardous Soil. Our works also included the supply of 800 tonnes of 6F2 for the piling mat, pile attendance and a reduced dig of 3,000m3.

c/o READIE CONSTRUCTION, Springfield Park Phase 2, Boreham, Chelmsford, Essex

Working with our client we successfully undertook the treatment and removal of 6,700m3 of Hydrocarbon Impacted Soil, followed by a further 24,000m3 of Non Hazardous Muck Away. In addition, we removed an additional 4,700m3 of Top Soil that was deemed not fit for purpose by the engineer.

c/o THURROCK COUNCIL, Calcutta Road, Tilbury, Essex, RM18

Working with our client we successfully removed 160 tonnes of Treatable Hazardous Muck Away as well as 900 tonnes of Fly Tipped Mixed Rubbish Away from this soon to be residential development.

c/o BRACE TURNER, New Frontiers Science Park, Third Avenue, Harlow, Essex, CM19

Working with our client we successfully removed 500 loads of Inert Muck Away from this former bund wall over a 5 week period.