Case Studies

Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

HERTFORDSHIRE

c/o MULALLEY, Chauncy School, Park Road, Ware, Hertfordshire, SG12

Contract Duration: November 2016 – October 2017

Working with our client we supplied 2,000 tonnes of our Clean Crush No Fines which was used in conjunction with over 300 tonnes of our Recycled 63-10mm Form Pave. We then removed 4,900m3 of Inert Muck Away from the reduced level dig.

c/o HIGGINS, Alma Road, St Albans, Hertfordshire

Contract Duration: February 2015 – March 2017

Working with our client we successfully removed 3,000m3 Inert Chalk, 4,000m3 Inert Muck Away and a further 1,500 loads Mixed Muck & Tarmac Away from this development. H&D Plant Hire provided the 22t Excavators and 14t Excavators to assist with the bulk dig. Once the units were completed we supplied our 8 wheeler grab lorries to remove the last of the spoil from around the site, as well as supplying 8 yard skips for clay.

c/o BORRAS, Cassiobury Park, Shepherds Road, Gade Avenue, Watford, Hertfordshire

Contract Duration: March 2016 – March 2017

Working with our client we successfully removed the Green Waste from the main parkland itself. We then supplied 600t Type 1 Crushed Concrete, 600t DOT Type 1 Granite and 300t 20mm Recycled Shingle for the drainage. At the back end of the job we removed 40 loads of Re Enforced Concrete from the pools.

c/o HERONSLEA, 106 Camlet Way, Hadley Wood, Hertfordshire

Contract Duration: October 2015 – September 2016

Working with our client we began supplying our Recycled 6F2 for the piling mat construction. When the weather got worse, we switched over to our Clean Crush No Fines material. We then assisted with the pile attendance before removing the bulk dig of 8,000m3. At it’s peak we were removing 45 loads per day.

c/o LAKEHOUSE, Garden Field School, Townsend Drive, St Albans, Hertfordshire

Contract Duration: June 2015 – April 2016

Working with our client we undertook the removal of the playground tarmac breakout, followed by 1,600m3 reduced level dig and then the supply of 36 loads of our General Purpose Top Soil. In addition we have also supplied Quarried DOT Type 1 as a capping layer for our Type 1 Crush material for use in the permanent works around the site.

c/o HERONSLEA, Windmill Street, Bushey, Hertfordshire

Contract Duration: May 2014 – February 2016

Working with our client we undertook the removal of 550 loads of Inert Material Away as well as the supply of quarried Shingle for use within the drainage. In addition, we have supplied over 60 loads of Screened Top Soil to be used in the back gardens.

c/o BALFOUR BEATTY, Simon Balle School, Mangrove Road, Hertford, Hertfordshire, SG15

Contract Duration: November 2014 – August 2015

Working with our client we produced a Recycled Type 3 at our recycling centre which was approved after delivering a sample load and subsequent tests being undertaken for compliance. A total volume of 3,700t was supplied as well as 10mm Quarried Shingle for the drainage and 1,400m3 Inert Material being removed during the reduced dig.

c/o INTERSERVE, West Hyde Water Treatment Works, Rickmansworth, Hertfordshire

Contract Duration: January 2014 – July 2014

Working with Interserve we successfully removed 3,000m3 of Hazardous Soil mixed with Asbestos to a facility in Peterborough during phase 1 of the scheme – and an additional 1,500m3 in phase 2. The project started slowly whilst the permit to dig was being processed but after that we removed between 100-200 tonnes per day.

c/o HERONSLEA, Sparrows Herne, Bushey, Hertfordshire

Contract Duration: May 2014 – May 2014

Working with our client we succesfully undertook the removal of 120 loads per week over a 7 week period of Inert Clay from this new development of flats in Hertfordshire. We also removed the pile caps and the concrete break out whilst the job was in it’s infant stages. Overall we disposed of 9,000m3 of material from site.