Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

HERTFORDSHIRE

c/o REGAL HOMES, Clarendon Road, Watford, Hertfordshire, WD25

Working with our client we successfully removed 400 tonnes of Hydrocarbon Impacted Soil and a further 600 loads of Inert Muck Away from this residential development. In addition, we also supplied 700 tonnes of Reject Sand and 800 tonnes of Recycled Shingle for the drainage works, as well as 1,000 tonnes of 63/10mm Form Pave, 20/4mm Form Pave and 2/6mm Form Pave for the permeable paving works.

c/o INTERSERVE, West Hyde Water Treatment Works, Rickmansworth, Hertfordshire

Working with Interserve we successfully removed 3,000m3 of Hazardous Soil mixed with Asbestos to a facility in Peterborough during phase 1 of the scheme – and an additional 1,500m3 in phase 2. The project started slowly whilst the permit to dig was being processed but after that we removed between 100-200 tonnes per day.

c/o DES, Maple Lodge Close, Rickmansworth, Hertfordshire, WD3

Working with our client we successfully removed 1,900 tonnes of Hazardous Fragmental Asbestos Mixed Muck Away from this commercial development, before undertaking additional sampling, and removing a further 170 loads of Incidental Non Hazardous Muck Away.

c/o MULALLEY, Meriden Estate, York Way, Watford, Hertfordshire, WD25

Working with our client we successfully removed 800 tonnes of Hydrocarbon Impacted Hazardous Soil, 8,000m3 of Non Hazardous Muck Away from the reduced dig of this multi phased residential development.

c/o HIGGINS, Alma Road, St Albans, Hertfordshire

Working with our client we successfully removed 28,000m3 Inert Chalk, 4,000m3 Inert Muck Away and a further 1,500 loads Mixed Muck & Tarmac Away from this residential development.

c/o GAVACAN HOMES, Dene Road, Northwood, Middlesex, HA6

Working with our client we successfully removed 11,000m3 of Inert Muck Away from this residential basement excavation for the new build block of luxury apartments. In addition, we supplied 900 tonnes of 6F2 for the piling mat construction and removed a further 1,100m3 of Pile Arisings.

c/o WESTON HOMES, Denham Film Studios, Denham, Hertfordshire

Working with our client we successfully removed 27,000m3 of Non Hazardous Muck Away from this residential development. We also supplied in excess of 700 tonnes of 6F2 for the piling contractor on site.

c/o WILLMOTT DIXON HOMES, Batchwood Garage Sites, St Albans, Hertfordshire

Working with our client we successfully removed over 500 loads of Non Hazardous Muck Away from this residential development. In addition, we also removed 200 tonnes of Hazardous Muck Away and supplied 400 tonnes of Reject Sand for the drainage works.

c/o READIE CONSTRUCTION, East Duck Lees Lane, Brimsdown, Enfield, Hertfordshire

Working with our client we successfully removed 11,000m3 of Inert Muck Away from this project on behalf of Tottenham Hotspur FC. At it’s peak we were removing 700 tonnes per day.

c/o HERONSLEA, 106 Camlet Way, Hadley Wood, Hertfordshire

Working with our client we began supplying our Recycled 6F2 for the piling mat construction. When the weather got worse, we switched over to our Clean Crush No Fines material. We then assisted with the pile attendance before removing the bulk dig of 8,000m3. At it’s peak we were removing 45 loads per day.

c/o HERONSLEA, Windmill Street, Bushey, Hertfordshire

Working with our client we undertook the removal of 550 loads of Inert Material Away as well as the supply of quarried Shingle for use within the drainage. In addition, we have supplied over 60 loads of Screened Top Soil to be used in the back gardens.

c/o HERONSLEA, Sparrows Herne, Bushey, Hertfordshire

Working with our client we successfully undertook the removal of 120 loads per week over a 7 week period of Inert Clay from this new development of flats in Hertfordshire. We also removed the pile caps and the concrete break out whilst the job was in it’s infant stages. Overall we disposed of 9,000m3 of material from site.