Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.
Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.
HERTFORDSHIRE
c/o INTERSERVE, West Hyde Water Treatment Works, Rickmansworth, Hertfordshire
Working with our client we successfully removed 3,000m3 of Hazardous Soil mixed with Asbestos to a facility in Peterborough during phase 1 of the scheme, followed by an additional 1,500m3 in phase 2. The project started slowly whilst the permit to dig was being processed but after that we removed between 300-500 tonnes per day.
c/o DES, Maple Lodge Close, Rickmansworth, Hertfordshire, WD3
Working with our client we successfully removed 1,900 tonnes of Hazardous Fragmental Asbestos Mixed Muck Away from this commercial development, before undertaking additional sampling, and removing a further 170 loads of Incidental Non Hazardous Muck Away.
c/o MULALLEY, Meriden Estate, York Way, Watford, Hertfordshire, WD25
Working with our client we successfully removed 2,200 tonnes of Hydrocarbon Impacted Hazardous Soil, followed by a further 11,400m3 of Non Hazardous Muck Away from the reduced dig of this multi phased residential development.
c/o HIGGINS, Alma Road, St Albans, Hertfordshire
Working with our client we successfully removed 32,000m3 of Inert Chalk, 4,000m3 of Inert Muck Away and a further 1,500 loads of Mixed Muck & Tarmac Away from this residential development.
c/o GAVACAN HOMES, Dene Road, Northwood, Middlesex, HA6
Working with our client we successfully removed 16,000m3 of Inert Muck Away from this residential basement excavation for the new build block of luxury apartments. In addition, we supplied 1,100m3 of 6F5 for the piling mat construction and removed a further 1,900m3 of Pile Arisings.
c/o WESTON HOMES, Denham Film Studios, Denham, Hertfordshire
Working with our client we successfully removed 33,000m3 of Inert Muck Away from this residential development. We also supplied in excess of 2,700m3 of 6F5 for the piling contractor on site.
c/o READIE CONSTRUCTION, East Duck Lees Lane, Brimsdown, Enfield, Hertfordshire
Working with our client we successfully removed 22,000m3 of Inert Muck Away from this project on behalf of Tottenham Hotspur FC. At it’s peak we were removing 900 tonnes per day.
c/o HERONSLEA, 106 Camlet Way, Hadley Wood, Hertfordshire
Working with our client we began supplying our Recycled 6F5 for the piling mat construction. When the weather got worse, we switched over to our Clean Crush No Fines material. We then assisted with the pile attendance before removing the bulk dig of 12,000m3. At it’s peak we were removing 75 loads per day.
c/o HERONSLEA, Windmill Street, Bushey, Hertfordshire
Working with our client we undertook the removal of 550 loads of Inert Material Away as well as the supply of quarried Shingle for use within the drainage. In addition, we have supplied over 60 loads of Screened Top Soil to be used in the back gardens.
c/o HERONSLEA, Sparrows Herne, Bushey, Hertfordshire
Working with our client we successfully undertook the removal of 120 loads per week over a 7 week period of Inert Clay from this new development of flats in Hertfordshire. We also removed the pile caps and the concrete break out whilst the job was in it’s infant stages. Overall we disposed of 9,000m3 of material from site.