Case Studies

Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

WEST LONDON

c/o NG GROUP, Rose Hotel, High Holborn, WC1V

Contract Duration: April 2017 – October 2017

Working with our client we successfully removed 100 loads of Re Enforced Concrete Away on Grab Lorries and a further 50 loads of Muck Away.

c/o REGAL HOMES, Beak Street, Soho, London, W1F

Contract Duration: November 2016 – August 2017

Working with our client we successfully removed 270 loads of Inert Muck Away. We initially began the project using our fleet of 8 wheeler grab lorries, and then moved to tippers once the site had been reduced enough to incorporate a larger machine on site.

c/o INTERSERVE PARAGON, Former Vinyl Factory, Blyth Road, Hayes, West Drayton, UB1 3HA

Contract Duration: February 2016 – August 2017

Working with our client we successfully removed 27,000m3 of Inert Muck Away from this residential development, which was featured on BBC News as a main feature due to the delicate works that are being undertaken to such a historic plot of land.

c/o HILL PARTNERSHIPS, Trinity Way, Acton, London, W3 7HS

Contract Duration: March 2016 – August 2017

Working with our client we successfully removed 1,700m3 of Inert Muck Away via Grab Lorry and Tipper lorry before supplying in excess of 400t Type 1 Crushed Concrete, 200t DOT Type 1 Granite and 200t of quarried Shingle for the drainage works.

c/o ATPS CONSTRUCTION, Town Centre, High Street, Sutton

Contract Duration: October 2015 – February 2016

Working with our client we removed in excess of 400m3 of Chalk, Clay, Made Ground & Breeze Blocks mixed together. The site required forward planning as the lorries had to have been and gone by 930am every morning because the road had to be opened up again to the general public.

c/o LAKEHOUSE, Ellen Wilkinson School, Queens Drive, Acton, W3

Contract Duration: November 2015 – February 2016

Working with our client we produced 500t Reclaimed 20-4mm Form Pave for use underneath the permeable paving. We also carried out the removal of 1,500m3 Inert Muck Away, as well as the supply of various recycled aggregates for the drainage and through road construction.

c/o HIGGINS, Vinery Way, Off Goldhawk Road, Shepherds Bush, W6

Contract Duration: June 2015 – February 2016

Working with our client we successfully removed over 200 loads of Inert Muck Away using our fleet of 8 wheeler grab lorries.

c/o BARRATT HOMES, Victoria Square, Acton, W3

Contract Duration: March 2015 – May 2015

Working with our client we undertook the removal of 1,200m3 of Inert Spoil using our fleet of 8 wheeler grab lorries for this brand new development of flats.

c/o BALFOUR BEATTY, Westminster Palace, 4 Milbank, London, WC2

Contract Duration: October 2014 – March 2015

Working with our client we removed over 150 loads of Inert spoil from this development. We also supplied our Reject Sand & 10mm Quarried Shingle for the drainage and ducting.

c/o MITCHAM COUNTY COUNCIL, 218 Tamworth Lane, Mitcham, Surrey

Contract Duration: September 2014 – October 2014

Working with our client we removed and recycled the entire reduced level dig of Inert spoil over a 2 week period.

c/o LIDL STORES, 33 Abercornway Road, Morden, SM4 5LN

Contract Duration: September 2014 – October 2014

Working directly for Lidl Stores we undertook the removal of 600m3 of Mixed Construction Waste & Spoil from the main car park area at this brand new development.

c/o HENRY BROTHERS, Grange School, Church Gardens, Ealing, London, W5

Contract Duration: April 2014 – July 2014

Working with our client we removed over 50 Grab loads of Inert Material Away whilst co-operating fully with the timed site restrictions owing to the site being a fully operational school.