Case Studies

Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

SOUTH LONDON

c/o BOLT & HEEKS, Brompton Cemetery, Fulham Road, London, SW10

Contract Duration: May 2017 – October 2017

Working with our second client on this project we successfully removed 85 Grab loads of Inert Muck Away, as well as 30 Grab loads of broken out Concrete Away.

c/o BENNETT CONSTRUCTION, Peartree Way, Greenwich, London, SE10

Contract Duration: January 2017 – September 2017

Working with our client we successfully removed 8,000m3 of Inert Muck Away from this residential development next to the iconic O2 arena.

c/o VOLKER FITZPATRICK, Former David Beckham Academy, Chandlers Avenue, Greenwich, SE10

Contract Duration: May 2016 – June 2017

Working with our client we successfully removed 2,800m3 of Muck Away, 30 loads Tarmac Away and 20 loads Concrete Away.

c/o DURKAN, Forster Road, Clapham, London, SW2

Contract Duration: May 2016 – June 2016

Working with our client we successfully removed 2,000m3 of Inert Material Away from this residential development.

c/o CARDY GROUP, Former MOT Garage, Stewart Road, Battersea, SW11

Contract Duration: September 2015 – December 2015

Working with our client we provided the removal of 3,000m3 Inert Muck Away as well as Recycled Shingle, Reject Sand and Type 1 Crush. H&D Plant Hire provided the Self Drive excavator hire.

c/o AREA 29, Wyfold Road, Fulham, SW9

Contract Duration: July 2015 – November 2015

Working with our client we successfully removed 3,700m3 Inert Material Away from this basement dig, ready for the construction of a new block of flats. H&D Plant Hire provided the Self Drive excavator hire for the duration of our package.

c/o GILBERT ASH, 16-20 Windsor Walk, Denmark Hill, SE5

Contract Duration: July 2015 – November 2015

Working with our client we undertook the removal of 1,700m3 of Inert Muck Away on grab lorries from this basement dig in South East London. We were servicing the site with up to 6 grab lorries per day during it’s peak.

c/o ROYAL PARKS, Brompton Cemetery, Fulham Road, Chelsea, SW10

Contract Duration: March 2015 – May 2015

Working with our client we successfully removed the 700m3 of material from a number of catacombs located within the cemetery on our fleet of 8 wheeler grab lorries. Because the material had to be removed in wheel barrows and stockpiled in the cemetery grounds, there was a very strict time schedule involved so that graves were not disturbed.

c/o BUCKINGHAM GROUP, Europa Littlebrook, Dartford Power Station, Dartford, DA1

Contract Duration: June 2014 – May 2015

Working with our client Green Build Environmental Ltd + H&D Plant Hire teamed up to offer a unique package deal on this industrial unit design & build scheme. Our 14t Excavators, 9t Swivel Dumpers and 14t Hydraulic Hammers have been on site since the Summer of 2014.

In total we have supplied over 10,000t DOT Type 1 Crush for the footprint of the building, a further 2,500t 10mm Recycled Shingle for the deep drainage and over 800t Reject Sand to backfill the ducts.

c/o BELLWAY HOMES, Priory Mill, Priory Street, Dartford, DA1

Contract Duration: January 2015 – April 2015

Working with our client we undertook the removal of 800 tonnes of Non Hazardous Spoil from this new housing development over a 5 day period

c/o INNOVATE SPACE, Croydon Road, Penge, London, SE20

Contract Duration: December 2014 – January 2015

Working with our client we successfully removed over 700 tonnes of Broken Concrete mixed with Asbestos over a period of 4 days leading up the Xmas break.

c/o MCLAREN, Dulwich College, College Street, Dulwich, London, SE21

Contract Duration: March 2014 – January 2015

Working with our client we undertook the removal of over 200 loads of Inert Material Away as well as the supply of our 20mm Recycled Shingle for the drainage, Type 1 Graded Crush for the road reinstatement and then the removal of 100m3 of Mixed Muck & Tarmac Away which had been stockpiled throughout the course of the project.

c/o M L HART, Garage Sites, Morden & Wimbledon

Contract Duration: March 2014 – June 2014

Working with our client we successfully undertook the testing and removal of Asbestos Contaminated Soil from these former garage sites. The land had to be reduced to make way for back gardens on the new development plots.

c/o LAKEHOUSE, Battersea Dogs Home, Sopwith Way, Battersea, London

Contract Duration: February 2014 – August 2014

Working with our client we undertook the soil sampling and removal contaminated sludge from the reduced level dig, 2,000m3 of Inert Clay, 200m3 of Mixed Clay & Roots Away as well as supplying over 200 loads of our recycled 6F2 material to create a piling mat, followed by the removal of this material once used.

c/o HIGGINS HOMES, Myatts Estate, Cowley Road, Brixton, London, SW9

Contract Duration: October 2013 – January 2014

Working with our client we supplied 150 loads of 6F2 for 2 large piling mats over a period of 7 working days. The mat needed to be withstand the weight of 40t rig for piling.

c/o BALFOUR BEATTY, Sacred Heart School, Knatchbull Road, Camberwell, London, SE5

Contract Duration: March 2014 – July 2014

Working with our client we removed 1,000m3 of Mixed Spoil Away containing Grass, Copper Wire, Timber and various other deleterious matter.