Case Studies

Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

OTHER

c/o CAMBRIDGE UNIVERSITY, River Lane, Cambridge, Cambridgeshire, CB5

Contract Duration: February 2017 – October 2017

Working with our client we successfully removed 600 loads of Non Hazardous Muck Away from this former forecourt site, as well as a further 170 loads of piling mat material.

c/o J BREHENY, Station Road, Kemble, Gloucestershire

Contract Duration: January 2017 – April 2017

Working with our client we successfully provided 6 day work tippers for 2 weeks to remove the 2,700 tonnes of stockpiled Top Soil. We then undertook the removal of 145 loads of Inert Muck Away, as well as grab lorries to remove the residual utility arisings left from the road construction.

c/o AYALA HOMES, Larch House, 9D Elmwood Cross, Slough, Buckinghamshire, SL9

Contract Duration: September 2016 – August 2017

Working with our client we successfully removed 4,500m3 of Inert Muck Away and supplied 120 loads of our Clean Crush No Fines to be used for the piling mat construction.

c/o INTERSERVE, A45 Road, Rushden, Northamptonshire

Contract Duration: December 2016 – March 2017

Working with our client we successfully Mixed Tree Roots, Logs and Clay from the main carriageway of this new business park development.

c/o CARLA HOMES, Shopwyke Lakes, Shopwyke Road, Chichester

Contract Duration: November 2016 – January 2017

Working with our client we successfully supplied 800t 10mm Quarried Shingle for the drainage works and 1,800t 6F2 for the piling mat construction.

c/o HILL PARTNERSHIPS, Clarence House, St John’s Street, Bedford, Bedfordshire, MK43

Contract Duration: April 2016 – September 2016

Working with our client we successfully removed 1,800m3 of Inert Muck Away and supplied 10mm Quarried Shingle for the drainage works.

c/o HILL PARTNERSHIPS, Tenison Road, Cambridge, CB1

Contract Duration: May 2015 – March 2016

Working with our client we successfully supplied in excess of 600t of Form Pave for the permeable paving works in 63-10mm, 20-4mm and 2-6mm sizes. Our fleet of 8 wheeler grab lorries removed over 70 loads Inert Muck Away and we also supplied 500t General Purpose Top Soil for the back gardens.

c/o J BREHENY CIVIL ENGINEERING, Bicester Business Park, Oxford Road, Bicester, Oxfordshire, OX26 1AN

Contract Duration: May 2015 – February 2016

Working with our client we secured the package to supply 7,000t 6F2 Graded to bring the new relief road up to level and then a further 10,160t Type 1 Graded Crush to cap the road ready for the tarmac sub contractors to finish off. We were also used to sample and remove an area of Asbestos Contaminated road which contained fragments of Chrysotile & Amosite Asbestos. In addition, we also undertook the haulage of the IBA fill material to the Bicester Eco Park in back loads to help keep the costs down. H&D Plant Hire provided excavators in various sizes to help assist throughout the full package.

c/o INTERSERVE, Aylesbury STW, Rabbans Lane, Aylesbury, HP19 8RS

Contract Duration: March 2015 – January 2016

Working with our client we sourced a suitable Recycled Type 1 to be used in the permanent works of the road construction which totalled 600m3. We also supplied our DOT Type 1 for use within the footpaths.

c/o BOVIS HOMES, Lancaster Gate, Bac Lane, Cambourne, Cambridgeshire, CB22 6JT

Contract Duration: March 2015 – August 2015

Working with our client H&D Plant Hire supplied our 14t Excavators, 22t Excavators, 9t Swivel Dumpers, 9t Straight Tipping Dumpers and a host of excavator attachments ranging from Breakers to Compactors.

c/o VOLKER FITZPATRICK, M1 J10A Southbound Works, Luton, Bedfordshire

Contract Duration: March 2015 – April 2015

Working with our client we successfully removed 2,300m3 6F2 Material Mixed With Soil from this Civil Engineering project. The stockpile was removed over a 2 week period.

c/o SDC CONSTRUCTION, Flitwick Leisure Centre, Steppingley Road, Flitwick, Bedfordshire

Contract Duration: December 2014 – March 2015

Working with our client on a tight budget we produced a Recycled Type 3 Graded Aggregate for use as a sports pitch under layer. The total volume was just over 600t and was supplied either side of Xmas.

c/o BORRAS, Nalders Road, Chesham, Buckinghamshire

Contract Duration: November 2014 – February 2015

Working with our client we successfully removed over 150 loads of Inert Material from this brand new housing project in Buckinghamshire. We also imported 500t DOT Type 1 Crushed Concrete.

c/o VOLKER FITZPATRICK – Gatwick Airport South Terminal

Contract Duration: December 2013 – January 2014

Working closely with Volker Fitzpatrick site and technical team, we sourced the appropriate spec of Top Soil to be used in the landscaping area around the South Terminal.

c/o BROWN & MASON DEMOLITION – Various Sites

Contract Duration: December 2013 – January 2014

Working with Brown & Mason Demolition we fixed our price for the supply of over 200 bags of Rock Salt which were supplied to their demolition sites across Kent, Sussex and Essex. All of the bags were delivered on pallets and carefully offloaded by our trained operators.

c/o BP ROTHERSTHROPE NORTH, M1 Junction 15A

Contract Duration: December 2013 – January 2014

working with our client we supplied quarried Type 1 for use around the replacement fuel tanks and to create the road joining the M1.