Green Build Environmental Ltd is proud to be involved with all projects – regardless of size or contract duration.

Below are a few examples of completed projects that enable our clients to understand the types of works that we have been involved with in recent months.

EAST LONDON

c/o WILLMOTT DIXON, Ive Farm, Leyton, London, E10

Contract Duration: August 2017 – October 2017

Working with our client we successfully removed 300 loads of Non Hazardous Top Soil Away over a 13 day period.

c/o WILLMOTT DIXON, Heathcote School, Whitehall Road, Chingford, London, E4

Contract Duration: September 2016 – October 2017

Working with our client we successfully removed 600 loads of Inert Muck, as well as supplying 1,300t of Type 1 Crushed Concrete, 800t of 6F2, 200t of 20mm Recycled Shingle, 200t of Reject Sand and 25 loads of Top Soil.

c/o HIGGINS, Banbury Park, Billett Road, Walthamstow, London, E17

Contract Duration: October 2014 – August 2017

Working with our client we successfully removed in excess of 19,000m3 of Inert Spoil from this residential development. Due to on site contractor deliveries we had to meet an extremely specific programme meaning we could only remove material 3 days per week – at 600t per day, as well as night shift working.

c/o FARRANS CONSTRUCTION, Maltings Close, Off Twelvetrees Crescent, Bow, London, E3

Contract Duration: February 2016 – March 2017

Working with our client we successfully removed the Non Hazardous Spoil before carrying out the reduced dig of 3,000m3. In addition, we also supplied 20mm Quarried Shingle for the drainage and 60 loads of Recycled 6F2 for the initial piling mat construction.

c/o LDC CONSTRUCTION, Blackhorse Road, Walthamstow, London, E17

Contract Duration: October 2015 – November 2016

Working with our client we successfully undertook the removal of 11,000m3 Inert Material Away from the basement of this brand new construction of student accommodation.

c/o GALLIFORD TRY, Former Plaistow Hospital, Samson Street, Plaistow, London, E13 – PHASE 2

Contract Duration: December 2014 – May 2016

Having serviced the job efficiently during phase 1 of this scheme, back in 2014, we were asked to undertake the package of removing a further 6,000m3 Inert material from phase 2 of this project. We began by removing stockpiled material using our fleet of Grab Lorries because the machines on site had other duties to fulfil. After the excavators became free we managed to sustain 15-20 loads per day until the site was cleared.

c/o WILLMOTT DIXON, Chingford Primary School, Burnside Avenue, Chingford, London, E4

Contract Duration: July 2015 – May 2016

Working with our client we successfully undertook the removal of 1,300m3 of Muck Away. We then supplied 600t Type 1 Crush as well as 1-200t of our Recycled Shingle to be used for pipe bedding around the building.

c/o WILLMOTT DIXON, Jenny Hammond School, Worsley Road, Leytonstone, E11

Contract Duration: July 2015 – May 2016

Working with our client we successfully removed 170 loads of Non Hazardous spoil away in grab lorries due to restricted access. We also supplied over 2,000t Type 1 Crushed Concrete for use underneath the permanent roads and pathways around the site.

c/o BOWMER & KIRKLAND, Buxton School, Cann Hall Road, Leytonstone, London, E11

Contract Duration: June 2015 – July 2015

Working with our client we successfully removed over 50 loads of Green Waste via our fleet of 8 wheeler Grab Lorries

c/o MULALLEY, Essex Wharf, Leabridge Road, Hackney, London, E9

Contract Duration: November 2014 – June 2015

Working with our client we successfully sourced an appropriate Top Soil to be used across all of the back gardens at the rear of the new build properties. In total we supplied 947m3.

c/o TELFORD HOMES, Cottall Street, Poplar, London, E14

Contract Duration: February 2015 – May 2015

Working with our client we supplied our latest 14t Tracked Excavator to undertake the on site segregation and then we removed 1,100m3 of Non Hazardous Soil to our Recycling Centre in Essex.

c/o HIRA CONSTRUCTION, 1 Cricketfield Way, Hackney, London, E9

Contract Duration: November 2014 – February 2015

Working with our client we removed 2,700m3 of Inert Clay from this basement dig. Every load was removed via Grab Lorry as the excavation went down 5 metres and so the spoil had to dumpered up to the car park.

c/o MACE, 1-13 Long Lane, Hackney, London, E2

Contract Duration: November 2014 – January 2015

Working with our client we were able to assist in split classifying the samples into Inert and Non Hazardous. Over a period o 8 working days we removed over 125 loads of Non Hazardous spoil and a further 10 loads of Inert material.

c/o CARILLION, Tidal Basin Road, Canary Wharf, London, E16

Contract Duration: August 2014 – February 2015

Working with our client we successfully undertook the removal of over 1,400 loads of Inert Muck Away with an average output of 700t per day at its peak. The site had 2 piling rigs producing wet material which was subsequently stockpiled to dry before being removed.

c/o WESTON HOMES, Stratford Edge, 80-82 High Street, Stratford, London, E15

Contract Duration: May 2014 – October 2014

Working with our client we removed over 200 loads of Non Hazardous spoil from the Made Ground during phase 1 of the works. We were then brought back in to undertake the the 4,000m3 reduced level dig following the results of our WAC test.

c/o GALLIFORD TRY, Former Plaistow Hospital, Samson Street, Plaistow, London, E13

Contract Duration: May 2014 – July 2014

Working with our client we removed over 250 loads of Non-Hazardous Material to our recycling centre in Purfleet.

c/o WILLMOTT DIXON, Calverton Primary School, Canning Town, London, E16

Contract Duration: September 2013 – January 2014

Working with our client we successfully supplied over 10,000t of Recycled Type 1 for use in the permanent works. In addition, we also supplied our 20mm Recycled Shingle for the drainage.